What an alteration agreement usually covers
- Scope of work and approved drawings (often prepared by an architect or engineer)
- Review by the building's architect or engineer, sometimes at the owner's expense
- Contractor insurance requirements and certificates naming the building and managing agent
- Security or damage deposits and fees
- Permitted work hours and days, elevator use and protection, debris removal
- Restrictions on "wet over dry" — placing kitchens or baths over living space below
- Project duration limits and penalties
Typical process
- Request the building's alteration agreement and house rules from the managing agent.
- Have drawings prepared and submitted for building review.
- Collect contractor licenses (DCWP) and insurance certificates.
- Obtain board or managing-agent approval, then DOB permits if required.
- Build, pass inspections, and close out with the building and DOB.
Tips
This guide summarizes official rules for general information. It is not legal advice. Rules and fees change — confirm with the agency before you act.
Frequently asked questions
Do I need an alteration agreement to renovate my co-op?
Most co-ops require board or managing-agent approval under an alteration agreement for anything beyond cosmetic work. Check your proprietary lease and house rules.
Does the building approval replace a DOB permit?
No. Building approval and DOB permits are separate; work that needs a DOB permit still needs one.
What does "wet over dry" mean?
A restriction on placing wet rooms (kitchens, bathrooms) above dry living space in the apartment below, because of leak risk. Many buildings restrict or prohibit it.